
Click the drawing to enlarge floor plans.
The new Lower School Arts building was completed in August of 2006 next to the Livengood Center. This building includes:
- A Lower School dance studio
- A Lower School art room
- A Lower School music room
- An entrance with a special WOW Reading Room and a separate gathering place for families
- Expanded storage areas