Click the drawing to enlarge floor plans.

The new Lower School Arts building was completed in August of 2006 next to the Livengood Center. This building includes:

  • A Lower School dance studio
  • A Lower School art room
  • A Lower School music room
  • An entrance with a special WOW Reading Room and a separate gathering place for families
  • Expanded storage areas